|
1.0 INTRODUCTION
| 1.1 |
Project History |
| 1.2 |
Relationship of the
Initial Study for HWP Addendum to the Arroyo Seco
Master EIR |
| 1.3 |
CEQA Requirements |
| 1.4 |
Approach to Evaluation of Environmental
Impact |
2.0 PROJECT DESCRIPTION
| 2.1 |
Project Location |
| 2.2 |
Site Characteristics |
| 2.3 |
Project Objectives |
| 2.4 |
Project Characteristics |
| 2.5 |
Intended Uses of the Initial Study |
3.0 ENVIRONMENTAL CHECKLIST FORM
| 3.1 |
Aesthetics |
| 3.2 |
Agricultural Resources |
| 3.3 |
Air Quality |
| 3.4 |
Biological Resources |
| 3.5 |
Cultural Resources |
| 3.6 |
Energy |
| 3.7 |
Geology and Soils |
| 3.8 |
Hazards and Hazardous Materials |
| 3.9 |
Hydrology and Water Quality |
| 3.10 |
Land Use and Planning |
| 3.11 |
Mineral Resources |
| 3.12 |
Noise |
| 3.13 |
Population and Housing |
| 3.14 |
Public Services |
| 3.15 |
Recreation |
| 3.16 |
Transportation/Traffic |
| 3.17 |
Utilities and Service Systems |
| 3.18 |
Mandatory Findings of Significance |
4.0 FOCUSED ANALYSIS OF BIKEWAYS AND TRAILS
| 4.1 |
Characteristics of the Bikeway and Trail Along the Northern
Property Boundary |
| 4.2 |
Characteristics of Other Existing Trails and Proposed Trail
Improvements |
| 4.3 |
Characteristics of the Suggested Perimeter Trail Bikeway |
| 4.4 |
Characteristics of the Suggested Sub Trail Options 1 and 2 |
| 4.5 |
Environmental Evaluation of Bikeways and Trail |
5.0 DETERMINATION
(temporary)
6.0 REFERENCES
APPENDICES
|