City of Pasadena Public Works
  Hahamongna Watershed Park - DRAFT Initial Study for the Hahamongna Watershed Park Master Plan Amendment for the Hahamongna Annex (11/20/09)  
pnr home
arroyo seco home
hahamongna annex
central arroyo stream restoration project
public works home

1.0 INTRODUCTION

1.1 Project History
1.2

Relationship of the Initial Study for HWP Addendum to the Arroyo Seco Master EIR

1.3 CEQA Requirements
1.4 Approach to Evaluation of Environmental Impact


2.0 PROJECT DESCRIPTION

2.1 Project Location
2.2 Site Characteristics
2.3 Project Objectives
2.4 Project Characteristics
2.5 Intended Uses of the Initial Study


3.0 ENVIRONMENTAL CHECKLIST FORM

3.1 Aesthetics
3.2 Agricultural Resources
3.3 Air Quality
3.4 Biological Resources
3.5 Cultural Resources
3.6 Energy
3.7 Geology and Soils
3.8 Hazards and Hazardous Materials
3.9 Hydrology and Water Quality
3.10 Land Use and Planning
3.11 Mineral Resources
3.12 Noise
3.13 Population and Housing
3.14 Public Services
3.15 Recreation
3.16 Transportation/Traffic
3.17 Utilities and Service Systems
3.18 Mandatory Findings of Significance

4.0 FOCUSED ANALYSIS OF BIKEWAYS AND TRAILS

4.1 Characteristics of the Bikeway and Trail Along the Northern Property Boundary
4.2

Characteristics of Other Existing Trails and Proposed Trail Improvements

4.3

Characteristics of the Suggested Perimeter Trail Bikeway

4.4 Characteristics of the Suggested Sub Trail Options 1 and 2
4.5 Environmental Evaluation of Bikeways and Trail

5.0 DETERMINATION  (temporary)

6.0 REFERENCES

APPENDICES

A URBEMIS Model Output
B Groundwater Collection and Sample Logs
C Soil Sampling Report
D Traffic Impact Study
E USFS Station Fire Report